Suzhou Lance Technology Co., Ltd.WWW.MR-RAIL.COM  ·  MR.RAIL@FOXMAIL.COM
MR-06 / MR-16 / MR-26 Through-Post Swageless Quick Lock Cable Railing Fittings for Level Runs
Products / MR-06

QUICK LOCK / SWAGELESS SYSTEM

Through-Post Swageless Quick Lock Cable Railing Fittings for Level Runs

MR-06 / MR-16 / MR-26

A straight through-post swageless Quick Lock solution designed to keep visible exterior hardware compact.

Material316 Stainless Steel
ApplicationWood or metal posts · Level and straight runs
Cable1×19 stainless steel cable
Sizes1/8" · 5/32" · 3/16"
Request quotation →

MODEL FAMILY

MR-061/8"MR-165/32"MR-263/16"

PRODUCT HIGHLIGHTS

Designed around the installation.

01

Straight through-post installation

02

Quick Lock fittings at both cable ends

03

No hydraulic crimper required

04

Tensioning access from either side

CONNECTION TECHNOLOGY

Quick Lock / Swageless connection method

The swageless Quick Lock connection uses internal one-way grip jaws to hold fully inserted, matching-diameter 1×19 cable without hydraulic crimping on that end. Push-in locking does not replace final cable tensioning.

Technology comparison →
Quick Lock connection technology

INSTALLATION GUIDE

Reference installation steps for the model family.

The reference sequence applies within MR-06, MR-16, MR-26. Hole size, thread specification and tool size must follow the approved specification for the selected cable diameter and project configuration.

End functions and project configurations

An Ending secures a cable end without tension adjustment. A Tensioner provides the adjustment for tensioning the run. Ending + Tensioner and Tensioner + Tensioner are both possible configurations, selected for the actual installation and compatible components.

Swageless and Swage describe the cable connection, not the number of tensioning ends. Push-in locking does not replace final tensioning.

Standard model layouts are reference configurations, not a requirement to buy one fixed pair. MR.RAIL reviews standardized products, compatible component combinations and project-specific customization. Confirm the cable, post interfaces, adjustment access, exact components and quantities before ordering.

1

Prepare aligned straight through-holes according to the approved model specification.

2

Insert the fitting assemblies through the starting and ending posts.

3

Cut and insert the matching 1×19 cable fully into both Quick Lock ends.

4

Hold the fitting body and complete final tensioning from the accessible side.

Tools and preparation

Drill and bit specified for the selected model, cable cutter, wrench and hex key.

Model documentation and selection

Confirm the exact model, cable construction and diameter before ordering. The selected manual and approved project design govern installation; this page is not a structural or code-compliance certificate.

START YOUR CABLE RAILING HARDWARE PROJECT

Ask about MR-06 / MR-16 / MR-26.

MR.RAIL@FOXMAIL.COM →

Buying for distribution or an OEM project?

Compare individual models, download the purchasing list and prepare a specification-led inquiry.

Distributor Center →