Suzhou Lance Technology Co., Ltd.WWW.MR-RAIL.COM  ·  MR.RAIL@FOXMAIL.COM
Suzhou Lance Technology manufacturing facility

FACTORY & QUALITY

Precision manufacturing.
Practical quality control.

From stainless steel components to assembled cable railing hardware and export packaging.

INTEGRATED PRODUCTION

Manufacturing organized around consistency.

Our production workflow connects machining, component preparation, assembly, inspection and packaging. OEM / ODM projects can be reviewed according to drawings, samples and target applications.

316 Stainless SteelCNC Machining & TurningOEM / ODM
MR.RAIL manufacturing areas and equipment

QUALITY WORKFLOW

Checks connected to every production stage.

The exact inspection items and acceptance requirements can be aligned with the customer order or approved specification.

01

Material control

Material and specification are checked before production.

02

Precision machining

Controlled machining supports repeatable component dimensions.

03

In-process checks

Key dimensions and surface conditions are checked during production.

04

Assembly & function

Components are assembled and function-checked before packing.

05

Packing & delivery

Packing and labeling are prepared according to order requirements.

Quality inspection and assembly workflow

INSPECTION & ASSEMBLY

Product checks before packing.

Material, dimensional, surface, assembly and functional checks can be included according to product and order requirements.

Packaging and delivery workflow

PACKAGING & DELIVERY

Prepared for the customer order.

Packaging quantity, carton configuration, weight and labeling are prepared according to confirmed customer requirements.

Material and outdoor use

Material and outdoor use

The MR-01–MR-06 Quick Lock families use 316 Stainless Steel for outdoor cable railing hardware. Confirm the model, exposure conditions and cleaning requirements for the project. Follow the selected fitting’s installation manual.

View full-size image ↗

THIRD-PARTY LABORATORY TESTING (SGS)

Measured sample tensile and salt-spray results.

Independent SGS laboratory checks on Suzhou Lance Technology 316 Stainless Steel sample assemblies verify mechanism grip strength and surface corrosion resistance.

Scope: Values reflect measured SGS laboratory results on the submitted sample assemblies only. Minor manufacturing tolerances occur across production batches; these figures do not constitute a guaranteed minimum rating for every unit and do not establish a complete railing system load rating or local building code approval.

Test item & sampleLaboratory conditionMeasured sample resultScope
Swageless / Quick Lock tensile (1/8" sample)23 ± 2 °C · 2 mm/min9,252 N (~2,080 lbf) max tensile forceTested 316 Stainless Steel sample assembly
Swageless tensile (5/32" sample)23 ± 2 °C · 5 mm/min12,582 N (~2,828 lbf) max tensile forceTested 316 Stainless Steel sample assembly
Neutral Salt Spray (ASTM B117-19)5±1% NaCl · 35±2 °C · pH 6.5–7.2 · 150 hoursNo visible change (no red rust, no white rust)Three machined 316 Stainless Steel component samples
MR.RAIL stainless steel fitting mounted in an Instron tensile testing machine during SGS laboratory evaluation

TENSILE FIXTURE

Instron laboratory pull setup.

Sample tensioner assembly mounted in calibrated tensile jaws to measure holding strength at 2 mm/min and 5 mm/min pull rates.

Tested 316 stainless steel swageless fitting and 1x19 cable assembly before and after SGS tensile pull test

TESTED SAMPLE COMPARISON

Before and after pull testing.

Tested sample assembly documented before loading and after reaching maximum tensile load on the submitted cable-and-fitting pair.

OEM / ODM COOPERATION

How custom hardware orders move from drawing to shipment.

Standard catalog models and custom-machined parts follow a clear four-stage review with pricing, MOQ and lead time confirmed per inquiry.

01

Drawing & sample review

Send 2D/3D drawings, target models or reference samples with cable size and post details.

02

Tolerance & sample check

Confirm machining tolerances, thread specs, surface finish and sample approval before batch runs.

03

Packaging & labeling

Configure inner bags, cartons, private-label marks or barcode labels for distributor or retail channels.

04

Batch QC & shipping prep

Coordinate dimensional checks, packing lists, carton weights and export dispatch per order terms.

TEST REPORT SUPPORT

Full SGS test reports are available upon inquiry.

Full third-party SGS reports can be shared for qualified B2B / OEM review. When a current or customer-designated report is required for a specific order, paid third-party or SGS testing can be arranged after confirmation.

START YOUR CABLE RAILING HARDWARE PROJECT

Send us your drawing, sample or inspection requirement.

Request a Quote →