Suzhou Lance Technology Co., Ltd.WWW.MR-RAIL.COM  ·  MR.RAIL@FOXMAIL.COM
Back to installation videos

MR-06 / MR-16 / MR-26 · Installation demonstration

MR-06 through-post Quick Lock installation video

Watch fittings seated through metal posts, cable insertion and hex-key tensioning.

Installation demonstration · 1:08English step subtitles

Before you follow the demonstration

The video shows a metal-post example with holes already prepared. The current manual covers aligned 12 mm through-holes for wood or metal posts on straight runs. Follow that manual for the complete preparation.

Use matching 1×19 stainless steel cable: MR-06 for 1/8 inch, MR-16 for 5/32 inch or MR-26 for 3/16 inch. For MR-06, specify S-LAY (left-hand lay).

Open the current installation manual (PDF)

Follow the sequence

These subtitles describe the visible actions; they are not a spoken transcript. The current model manual governs preparation, component selection and the complete installation procedure.

  1. 0:00–0:18

    Seat the first fitting

    The first fitting is positioned through the prepared post with the cable.

  2. 0:18–0:30

    Install the opposite fitting

    The matching assembly is seated in the opposite post.

  3. 0:30–0:42

    Check cable insertion

    The cable is handled and inserted at the fitting. Both ends must be fully seated before tensioning.

  4. 0:42–1:02

    Tension with the hex key

    Hold the wrench flats to prevent body rotation while turning the internal hex, as specified in the manual.

  5. 1:02–1:08

    Check the assembly

    Confirm that both fittings remain seated and the cable follows the straight run.

This demonstration does not establish a railing system load rating or code approval. Follow the selected manual, the approved project design and the applicable safety requirements.