Suzhou Lance Technology Co., Ltd.WWW.MR-RAIL.COM  ·  MR.RAIL@FOXMAIL.COM
Back to installation videos

MR-08 / MR-18 / MR-28 · Installation demonstration

MR-08 Swage Cable Railing Hardware Installation

Watch the wood-post installation sequence: mount the bases, use hydraulic crimping at both cable ends, then apply final tension.

Installation demonstration · 2:10English step subtitles

Before you follow the demonstration

Follow the current manual to select the matching crimping die and prepare the wood-screw pilot holes. The demonstration is a connection workflow, not a complete site-safety procedure or a structural certification.

Use matching 1×19 or 7×7 stainless steel cable: MR-08 for 1/8 inch, MR-18 for 5/32 inch or MR-28 for 3/16 inch. Both Swage ends require hydraulic crimping.

Open the current installation manual (PDF)

Follow the sequence

These subtitles describe the visible actions; they are not a spoken transcript. The current model manual governs preparation, component selection and the complete installation procedure.

  1. 0:00–0:16

    Mark and prepare mounting locations

    The installer marks the post and prepares pilot holes for the surface-mount bases.

  2. 0:16–0:44

    Secure the bases

    Both bases are fastened and aligned with the cable direction.

  3. 0:44–1:02

    Measure and insert the cable

    The cable is measured and inserted into the Swage fitting. Confirm its length and position before crimping.

  4. 1:02–1:30

    Hydraulic crimping at both cable ends

    Both cable ends require permanent hydraulic crimping. Confirm cable length and fitting position, use the matching die, and follow the crimper manufacturer’s instructions before inspecting both connections.

  5. 1:30–2:00

    Apply final tension

    The tensioner is adjusted using the wrench flats, following the current manual.

  6. 2:00–2:10

    Check the completed run

    Inspect alignment, seating and both permanent connections.

This demonstration does not establish a railing system load rating or code approval. Follow the selected manual, the approved project design and the applicable safety requirements.