MR-04 Quick Lock installation for metal-post level runs

Watch the threaded mounting parts, cable insertion and final tensioning for a straight metal-post run.

Installation demonstration · 0:53English step subtitles

Before you follow the demonstration

This excerpt begins with the prepared metal post. Follow the current manual for 1/4-inch–28 UNF threaded mounting holes and thread engagement. The original pull-test segment is omitted; this page does not establish a load rating.

Use matching 1×19 stainless steel cable: MR-04 for 1/8 inch, MR-14 for 5/32 inch or MR-24 for 3/16 inch.

Open the current installation manual (PDF)

Follow the sequence

These subtitles describe the visible actions; they are not a spoken transcript. The current model manual governs preparation, component selection and the complete installation procedure.

  1. 0:00–0:12

    Install the threaded mounting parts

    The threaded mounting parts are fitted into the prepared post.

  2. 0:12–0:20

    Attach the fitting body

    The Quick Lock body is assembled onto the post connection.

  3. 0:20–0:30

    Insert the cable

    Feed the matching 1×19 cable into the fitting. Insert both ends fully before final tensioning.

  4. 0:30–0:47

    Apply final tension

    The fitting is held while the tensioner is turned with a wrench.

  5. 0:47–0:53

    Check the straight run

    The connected cable and completed fitting are shown. Verify alignment and seating.

This demonstration does not establish a railing system load rating or code approval. Follow the selected manual, the approved project design and the applicable safety requirements.