
MR-03 / MR-13 / MR-23 · Installation demonstration
MR-03 hinged Quick Lock installation on metal posts
Watch the hinged fittings being mounted, the cable inserted and the angled connection tensioned.
Before you follow the demonstration
This installation excerpt starts after hole preparation. Use the current manual for the specified 1/4-inch–28 UNF threaded post connections. The original pull-test segment is omitted; no load rating or test result is claimed. The illustrated angle is not a stated adjustment limit.
Use matching 1×19 stainless steel cable: MR-03 for 1/8 inch, MR-13 for 5/32 inch or MR-23 for 3/16 inch.
Open the current installation manual (PDF)Follow the sequence
These subtitles describe the visible actions; they are not a spoken transcript. The current model manual governs preparation, component selection and the complete installation procedure.
- 0:00–0:15
Mount the hinged fitting
The hinged fitting is threaded into the prepared metal post.
- 0:15–0:25
Position and insert the cable
The cable is positioned between the fittings. The manual requires both cable ends to be fully seated before tensioning.
- 0:25–0:40
Assemble the connection
The fitting body is assembled and adjusted around the cable.
- 0:40–0:56
Tension the angled run
The installer works at the wrench flats on the hinged assembly. Follow the current manual for final tensioning.
- 0:56–1:02
Inspect the connection
The completed fitting is shown close up. Confirm alignment against the approved project design.
This demonstration does not establish a railing system load rating or code approval. Follow the selected manual, the approved project design and the applicable safety requirements.